ensv

Projects

  • Leadership
  • Management
  • Planning

Interim Project Manager for 2 onshore windfarms

Assignment
Pen-D Consult AB have as sub-consultant to Projektengagemang during winter 2016/2017 been working as interim Project Manager for 2 onshore windfarms in Sweden. The 2 project is undergoing a planning and development stage.

One project is geographic located in the north of Sweden with the permission of 10 WTG’s and an estimate maximum power of 40 MW. One project is geographic located the south of Sweden with the permission of 12 WTG’s and an estimate maximum power of 40 MW.

 

Sitemap